Overall perspective
Office facade perspective
Facade perspective
The overall site during land leveling construction
Pile construction combined with ground foundation treatment
Inspection and acceptance of concrete pile pressing works
Inspection and acceptance of Melaleuca piles delivered to the construction site
Inspection and acceptance of soil compaction (K value)
The overall project after the completion of pile foundation construction
The supervision consultant witnessed the concrete compressive strength test
Inspection and acceptance of drainage pipe installation for the factory building
Construction of factory building columns
Construction of the steel truss system and the perimeter walls of the factory building
Installation of roofing sheets for the factory building
The overall project after the installation of steel trusses and during the roofing sheet installation
Installation of reinforcement steel for the factory floor
Plastering of the perimeter walls and finishing of the factory floor
Construction of the internal road base
Exterior finishing works of the factory building
Interior finishing works of the office building
Final finishing works of the project
Final finishing works of the project
Final finishing works of the project