Overall perspective
Overall perspective
Existing site condition before construction
Proceed with site leveling and grading
Supervision and client took photos during the inspection at the pile supplier’s factory
Preparatory works for piling
Supervision inspected pile verticality during pile pressing
Supervision inspected pile load test during pile installation
Supervision and client surveyed the concrete supplier’s factory
Supervision checked concrete slump test at supplier’s factory
Inspection and acceptance of foundation formwork completed
Inspection of reinforcing steel upon delivery to site completed
Supervision checked concrete slump test on site
Supervision checked the quality of steel trusses at the manufacturing factory
General implementation of steel truss construction items
Supervision inspected and accepted beam reinforcement
Supervision inspected and accepted beam and slab reinforcement before concrete pouring
A ritual ceremony for the topping-out of the project was conducted
General implementation of the project’s roof works
Completion of metal roofing installation for the factory
Supervision checked construction elevation of internal roads
Supervision inspected and accepted aluminum and glass materials for office building interiors
project façade works have been completed
Façade finishing works are completed
Roof finishing works are completed
Completion of supporting works at the back of the factory building
Completion of side premises works of the factory
Completion of guard house and office building
Phase 2 site cleared and ready for next construction works